Canned Ham Trailers
56 Shasta Video List
Finished May, 2013





56 Shasta Build Still Photos




Restoring The 57 Shasta

  1. Part 1 - The Project Begins
  2. Part 2a - Demolition | 2b - Cabinet Removal | 2c - Removing The Floor
  3. Part 3a - Installing The New Floor | 3b - Installing The Floor Joists and Blocking | 3c - Installing the Sub-Floor and Sheathing
  4. Part 4 - Floor Prep And More Demolition
  5. Part 5a - Replacing A Birch Ceiling Panel | 5b - Removing A Birch Ceiling Panel | 5c - Installing The New Birch Ceiling Panel |
    5d - Building & Installing The Ceiling Framework | 5e - Insulation and Vapor Barrier | 5f - Reinstalling The Aluminum Top Skin
  6. Part 6 - Update and Rear Floor
  7. Part 7a - Rear Framing and Paneling | 7b - More on Framing and Paneling | 7c - Even More paneling |
    7d - Finishing The Rear Side Walls
  8. Part 8a - Back Panels And Framing | 8b - Rear Framing | 8c - Plywood Curbing | 8c - Wiring, Insulation & Vapor Barrier
  9. Part 9a - Installing The Rear Metal Skin | 9b - Rear Metal Continued | 9c - Rear Metal Continued
  10. Part 10 - Side Metal Fabrication
  11. Part 11a - Front Framing Begins | 11b - Framing WIth The Pocket Hole Jig
  12. Part 12a - Front Paneling And Framing | Part 12b - Front Panel Installation | Part 12c - Front Framing & Side Metal |
    Part 12d - Finishing The Front Side Metal
  13. Part 13 - More Front Framing & Insulation
  14. Part 14 - Front Metal
  15. Part 15 - Ready For Paint & Tail Light Holes
  16. Part 16 - Update and J Rail
  17. Part 17 - Rebuilding The Door
  18. Part 18a - HEHR Windows | Part 18b - Stripping The Paint | Part 18c - Polishing The Window Frames |
    Part 18d - Installing New Screen | Part 18e - Window Gaskets | Part 18f - Installing A HEHR Window
  19. Part 19 - Jalousie Window Tips
  20. Part 20 - Thresh Hold, Door Jamb & Update
  21. Part 21a - The Dinette Solid Glass Side Windows | Part 21b - Trimming in the plexiglass
  22. Part 22 - Brows and other stuff
  23. Part 23 - Baggage Door Locksets
  24. Part 24 - Update and Seat Boxes
  25. Part 25 - Dinette Seat Cabinets
  26. Part 26a - Shellac | Part 26b - More Shellac | Part 26c - Even MORE Shellac
  27. Part 27 - Flooring Tips and Progress Update
  28. Part 28 - Rock Guard and Formica Counter Top & Updates
  29. Part 29 - Progress Update
  30. Part 30 - Building The Bed Frame
  31. Part 31a - Screen Door and Table Leg | More Screen Door | Even More Screen Door
  32. Part 32 - Final Episode... Saying Goodbye